All the equipment of this laboratory is produced by the most important international company
ready for testing inverters up to 65,000 watts
The policy of this laboratory is to prevent human interference with the results, as the results are fully automated, and the equipment issues them directly to the report, and these results are illustrated and documented and cannot be modified
The number of equipment in this laboratory are 5 systems (Network input simulation system of photoelectric PV, Utility Grid network simulation system, islanding Test, RLC Load System, inverter control system. Testing Control system, data collection and results issuance.
All tests are carried out according to the specifications: IEC 50530 and IEC 62116 and NB/T 32004-2018 and GB/T 37409-2019